Use Custom Quantity
Remove Topsoil (12178 sf)
Excavate Footings (313 cy)
Back Fill (313 cy)
Final Grade (9803 sf)
Gravel (36 cy)
Track Out Pad (10 cy)
Sewer Line (25 each)
Water Line (25 each)
Gas Line (25 each)
Power Line (25 each)
Septic System (0 each)
Propane Tanks (0 each)
5 Bag (27 cy)
Continuous Footings (27 cy)
#4 Bars (1358 ft)
#4 (J) Bars (201 each)
1/2in Titen HD Bolts 5in long (40 each)
1/2inx3inx3in Slotted Washer (40 each)
1/2in washer (40 each)
5 Bag (32 cy)
#4 Bars (2679 ft)
1/2inX10in (J) Bolts (113 each)
1/2inx3inx3in Slotted Washer (113 each)
1/2in washer (113 each)
Foundation 2ft Wall Labor (0 ft)
Foundation 4ft Wall Labor (300 ft)
Foundation 6ft Wall Labor (0 ft)
Foundation 8ft Wall Labor (211 ft)
Foundation 9ft Wall Labor (0 ft)
Foundation 10ft Wall Labor (0 ft)
Foundation 11ft Wall Labor (0 ft)
Foundation 12ft Wall Labor (0 ft)
5 Bag (0 cy)
Interior Flat Work (1800 sf)
5 Bag (8 cy)
Garage Floors (575 sf)
5 Bag (0 cy)
Exterior Flat Work (0 sf)
5 Bag (0 cy)
#4 Bars (0 ft)
Suspended Slab (0 sf)
Pre-cast Slab (0 sf)
Suspended Slab (0 sf)
5 Bag (14 cy)
Exterior Flat Work (1050 sf)
5 Bag (2 cy)
Exterior Flat Work (127 sf)
5 Bag (2 cy)
Exterior Flat Work (127 sf)
5 Bag (1 cy)
Steps (4 each)
5 Bag (1 cy)
Steps (4 each)
5 Bag (1 cy)
Steps (4 each)
2x4 (92-5/8in) (0 each)
2x4 (104-5/8in) (297 each)
2x4 (10ft) (0 each)
2x4 (12ft) (0 each)
2x4 (16ft) (84 each)
2x6 (92-5/8in) (0 each)
2x6 (104-5/8in) (300 each)
2x6 (10ft) (0 each)
2x6 (12ft) (0 each)
2x6 (16ft) (78 each)
2x4 (16ft) Treated (0 each)
2x6 (16ft) Treated (21 each)
3-1/2in Sill Seal (0 ft)
5-1/2in Sill Seal (301 ft)
2x10 (16ft) (12 each)
7/16in OSB 4ftx8ft (0 each)
5/8in OSB 4ftX8ft (100 each)
3/4in OSB T&J 4ftx8ft (60 each)
7/16in OSB 4ftx9ft (88 each)
11-7/8in TJI 210 (1418 ft)
11-7/8in Rim Board (358 ft)
14in TJI 360 (0 ft)
14in Rim Board (0 ft)
16in TJI 360 (0 ft)
16in Rim Board (0 ft)
Construction Ashesive (18 each)
Stair Stringers (90 ft)
Stair Treads (58 ft)
1x8 Pine (58 ft)
Pre-Engineered Tusses (1518 ft)
1-3/4X11-7/8 LVL (42 ft)
8d Nails 3in (15807 each)
10d Nails 3in (0 each)
16d Nails 3in (10201 each)
H1 (115 each)
H2.5A (0 each)
2X2 Red Wood (0 ft)
2X4 Red Wood (0 ft)
2X6 Red Wood (0 ft)
Upper Cabinets Grade 1 (28 ft)
Lower Cabinets Grade 1 (41 ft)
Formica Counter Top (0 sf)
Tile Counter Top (0 sf)
Corian Counter Top (0 sf)
Granite Counter Top (82 sf)
Base Molding (845 ft)
Crown Molding (214 ft)
Chair Molding (214 ft)
Wall Paneling (0 ft)
Casing (294 ft)
Header (116 ft)
Window Sill Trim (56 ft)
MDF 1X8 (56 ft)
Shelving 3/4in x16in (122 ft)
Closet Rod (52 ft)
Closet Brackets (3 each)
Railing (0 ft)
Newell Post (0 each)
Handrail (0 ft)
Interior Swinging Door (10 each)
Interior Double Door (1 each)
Exterior Standard Door (2 each)
Fire Rated Door (1 each)
Entry Door (1 each)
Garage Door (2 each)
Wall 2X6 R19 Insulation (2102 sf)
Ceiling R50 Insulation (2375 sf)
Wall 2X4 R13 Insulation (1680 sf)
Wall 2X4 R13 Insulation (801 sf)
Vinyl (0 sf)
Cement Board (3605 sf)
Stucco (0 sf)
Brick (0 sf)
Synthetic Rock (190 sf)
Rock (0 sf)
House Wrap (3795 sf)
Gutters (172 ft)
Fascia (344 ft)
Sofit (344 sf)
Asphalt Hip and Ridge (103 ft)
Asphalt Shingles Starter (205 ft)
D Drip (344 ft)
Ice & Water Shield (11 square)
Roof Underlayment (21 square)
Roof Vents (9 each)
Angle Flashing (0 ft)
Asphalt Shingles 4/12 (0 square)
Asphalt Shingles 5/12 (0 square)
Asphalt Shingles 6/12 (0 square)
Asphalt Shingles 7/12 (31 square)
Asphalt Shingles 8/12 (0 square)
Asphalt Shingles 9/12 (0 square)
Asphalt Shingles 10/12 (0 square)
Asphalt Shingles 11/12 (0 square)
Asphalt Shingles 12/12 (0 square)
Hall & Closet Knob (1 each)
Privacy Door Knob (10 each)
Exterior Door Knob (4 each)
Dead Bolt (3 each)
2ftX3ft (1 each)
3ftX5ft (1 each)
4ftX4ft (2 each)
5ftX4ft (6 each)
Window Wells (0 each)
Window Flashing Wrap (465 ft)
Sheetrock (10886 sf)
Tape & Mud (10886 sf)
Paint Walls (8511 sf)
Paint Ceiling (2375 sf)
Carpet (1350 sf)
Linoleum (0 sf)
Tile (180 sf)
Wood (0 sf)
Laminate Wood (270 sf)
Soft water rough-in (0 each)
1/3 HP Disposal (1 each)
Fridge Water (1 each)
Kitchen Sink sprayer (1 each)
50 Gall Hot Water Heater (1 each)
Extra shower tile type (1 each)
Large Tub (0 each)
Jet tube allow 800 (1 each)
Washer hook ups (1 each)
Utility stainless sink (by washer) (1 each)
Garage fiber utility sink (0 each)
Kitchen cast iron wh. Sink ov/stain (1 each)
Extra Bathroom Sink (1 each)
1/2 bath (0 each)
3/4 bath tile type shower (0 each)
Full bath (2 each)
Rough in Baths (0 each)
Tub Surround (2 each)
Shower Suraound (2 each)
Shower Doors (2 each)
Mirrors (3 each)
Toilet Paper Holder (2 each)
Towel Rack (2 each)
Refrigerator (1 each)
Freestanding Range (1 each)
Cook Top (0 each)
Wall Oven (0 each)
Double Wall Oven (0 each)
Oven Hood (0 each)
Dish Washer (1 each)
Microwave (0 each)
Microwave Built in (0 each)
Microwave Over Stove (1 each)
Heating & Air Above Grade (1800 sf)
Heating & Air Basement (0 sf)
Gas Fire Place (0 each)
Gas Fire Place Un-vented (0 each)
Wood Burning Fire Place (0 each)
Wood Burning Stove (0 each)
Living area (1800 sf)
Unfinished Area (0 sf)
Garage Area (575 sf)
Light Fixtures (2375 sf)
Fire Sprinkler System (0 sf)
Final Cleanup (1800 sf)
Temp Toilet (6 month)
Temporary Power (6 month)
Construction Layout (3 each)
Fire Extinguisher (1 each)
Above Grade Inspection (1800 sf)
Basement Inspection (0 sf)
Road Impact Fee (1 each)
Park Impact Fee (1 each)
Sewer Connection Fee (1 each)
Water Connection Fee (1 each)
Gas Connection Fee (1 each)
Power Connection Fee (1 each)
Construction Plans & Specs (1800 sf)
Use Price List Use Custom Price
Select Price Group:
Site Work
Building Permit Fee
Utilities Connection Fee
Utilities Lines
Septic System
Propane Tanks
Drywall
Paint
Concrete Labor
Concrete Shoring
Concrete Foundation
Concrete
Rebar
Hardware
Door Hard Ware
Roofing
Misc. Roofing
Lumber
Trusses
TJI Joist
LVL
Simpson
Framing Miscellaneous
Cabinets
Counter Tops
Insulation
Siding
Finish Carpentry
Interior Doors
Exterior Doors
Windows
Plumbing
Bath Accessories
Shower Surrounds
Floor Covering
Appliances
HVAC
Fire Place
Electrical
Fire Protection System
Indirect Costs
Select Price Item:
Remove Topsoil
Excavate Footings
Back Fill
Final Grade
Gravel
Track Out Pad
Default Price Edit Price List
Material Price $0.05/ sf + 7% Tax
Material Total $652 Labor Price $0.02/ sf
Labor Total $244
Summary Group Select Summary Category:
01 General Requirements
02 Site Construction
03 Concrete
04 Exterior Finishes
05 Rough Carpentry
06 Cabinets & Finish Carpentry
07 Thermal and Roofing
08 Doors and Windows
09 Finishes
10 Drywall
11 Equipment
12 Plumbing
13 Mechanical
14 Electrical
15 Miscellaneous
Select Summary Item:
Site Work
Utilities and Utility Connections
Water Line
Construction Track out pad
Septic System
Propane Tanks
Well
Road